Cabinets Are In!

Day 3 and the cabinets are all installed! I picked such simple clean lines. I love them. I hope the plain doors will be easier to clean than my old ones. The cooking grease used to get into the ridges in the old doors and nothing I did would get it out.

cabinets 002 copy

They closed in the soffit above the upper cabinets. I didn’t realize that. I thought they were only going to remove the railing and cover the wall in back. OOPS. Oh well, this looks good too. I think I will need to stencil a design of some type on the blank soffit.

cabinets 003 copy

Tomorrow will be a day off for them. I have to go to our Foxboro office in the morning, dentist mid afternoon and the Somerville office at 5 pm so no way there’s any time for workmen.

cabinets 001 copy

Friday the counter tops go in! Yay! The stove has to be disconnected and pulled out for them to install the counters. I hope they turn it back on once the counters are in. I’d hate to go the whole weekend without a stove or oven!

cabinets 006 copy

Day 2 of the Great Kitchen Makeover

I awoke to a flooded kitchen! Yup the bucket containing the drip had overflowed during the night. I grabbed a bunch of old towels and began the mop up.  Right at 8 am the door bell rang and my two perky installers arrived ready for a full days work. I explained that the pail had over flowed and we pondered the problem for a bit. Then they started on their main business, the cabinets.

002 copy

I went out to locate our property manager who then called in a drain specialist to address the water problem. They only made it worse so the cabinet guys came up with a plan that seemed to solve the drip. They diverted it to a higher point so it was now running downhill into the drain. After all water can’t run uphill.

001 copy

The cats were underfoot all day! The noise was deafening with the sanders and hand saw. You would have thought they would have stayed hidden with all the commotion!

003 copy

The plastic drapes were hung today as a lot of sawdust was being generated, They had their big shop vac running to add to the mayhem.

004 copy

But I am beginning to see progress. Can’t wait til the doors go on and I can really see the new look! A lot different from those old dark cabinets.

005 copy

I think the kitty cats are down for the count. Should be a quiet night!

Let The Tear Out Begin

Things really started happening fast. Friday the counter top people came in and made templates of the counters. Then Saturday I got a call from Home Depot that the materials had come in and they were ready to start. They wanted to start Monday!

kitchen2 008 copy

I had Sunday to take everything out of the cabinets! I am now living in boxes. That show about hoarders has nothing on me.

kitchen2 011 copy

I used the clean out as an opportunity to toss all the old  plastic containers that always seem to get saved and accumulated. Do I use them? Sometimes but much less since I’ve been working from home so bye bye. I’ll just start collecting again.

kitchen2 010 copy

2 guys from Home Depot arrived right on time at 9:30. It was a nasty rainy day out so they didn’t want to set up all their equipment in the rain so all they did was the tear out. Good bye yellow tiles! They were done by noon.

kitchen2 016 copy

The cats had a lot of exploring to do.

kitchen2 014 copy

The guys left the fridge pulled out for me so I could vacuum the coils and mop the floor behind it. They found a treasure trove of cat toys. Both of the installers told me they had cats a of their own at home so they found Buddy’s antics funny and they saved all of the toys from behind the fridge!

kitchen2 013 copy

They found a leak under the sink but since a plumber will be coming out anyway we just stuck a bucket under it for now.

While they were tearing everything out I got a call from the counter people. They will come out between 8-9 on Friday to install the counters.  Everything should be done by Friday!

The plumber might have to come out on Saturday but we are hoping not. I have to buy the over the oven microwave and arrange for my electrician to come out and we will be done!

Wow!

 

 

 

It’s going to be a Busy few Months

Hello again everyone. Work is beginning to slow down for the agents. It hasn’t for me yet because we still have a lot of closings in the pipeline. Once those are done my lull will begin.

In the meantime I had the representative from Home Depot out to look at my kitchen and give me options. I’d considered several local firms but they were really expensive. Then I saw a home that had been done by Home Depot. I couldn’t believe it. It was beautiful. I think of Home Depot as DIY but they have a whole crew for remodels and like my company, they are paid on customer satisfaction.

At first I was going to do a remodel and knock down a wall, pull out all the cabinets and so on but there was a hitch. The electrical panel in my unit wasn’t up to code. To do a remodel would mean redoing the electric in the unit. Very  expensive on top of the remodel cost plus we’d have to pull permits for all the work.Work that requires permits can be tricky if you want to sell. I’ve run across that more than once when getting the documents together  for a closing.

kitchen 002 copy

So option 2. Leave the wall, and do a “Reface”. It’s not much less than a remodel but it doesn’t require permits. I liked that idea better than adding an extra $10 K to the project so I picked out new doors, hardware, back splash, tile, counters and wrote a very big check. Still I can see what it will look like in my minds eye. It will be so different and I’ll be able to open the drawers without them cracking and breaking in my hands!

kitchen 001

About a week after the salesman was out I got a call from the estimator. The salesman had measured but this guy was out to confirm the measurements and my choices of color, tile etc.  Good thing because the wrong tile was on the order.  We caught that and made the correction. This guy was very meticulous.

kitchen 003 copy

I’ve got one more appointment before they can start. The counter top people have to come out and make templates. They will be here on Friday. I requested that day off so I can get everything off the counters and round up the cats while they work and measure.

Once the work starts it is expected to take 1 week. They start on Monday and finish on Friday. I can’t wait!